Work
3E was contracted by in 2013 EDPR to provide Lenders Technical Advisory Services to the mandated Lead Arranger – Standard Bank – for the two projects they planned to submit to round 3 of the REIPPP. The first project was a 36MW wind farm. The second project was a 75MW photovoltaic solar plant in the Northern Cape. Pre Bid submission tasks included site visits, design verification, forecast energy sales report, technical gap analysis, grid connection review and environmental, permitting and authorizations review.